Protecting Campus Infrastructure for the Future

Deferred maintenance refers to repairs and renewal projects that are delayed over time due to limited funding or competing priorities. At ±¬ÁÏÉçÇø, addressing these needs is essential to maintaining safe, reliable, and high-performing facilities that support student success and daily campus operations.

Key Campus Stats

Campus Buildings

35

Square Footage

2+ Million

Avg. Building Age

25 Years

Replacement Value

$3B

 


Explore the sections below to learn more about deferred maintenance at ±¬ÁÏÉçÇø

  • Why Deferred Maintenance Matters to ±¬ÁÏÉçÇø?

    As ±¬ÁÏÉçÇø continues to grow, campus facilities and infrastructure naturally age. Deferred maintenance, when addressed, helps ensure buildings remain safe, functional, and supportive of teaching, learning, and research. Taking action on these needs improves reliability, reduces risk, supports sustainability goals, and protects the university’s long-term investment in its physical assets.

  • How Projects Are Prioritized

    ±¬ÁÏÉçÇøâ€™s Deferred Maintenance Planning Committee helps review facility needs, assess priorities, and align projects with campus goals, risk factors, and available funding.

    • Life safety and risk reduction
    • Code and regulatory compliance
    • Asset lifecycle and condition
    • Sustainability and efficiency improvements
    • Data-driven decision making
    High-Level Prioritization Process
    1. Facility Assessments - Building systems and infrastructure are evaluated to identify conditions, risks, and renewal needs.
    2. Subject Matter Expert Review - Facilities professionals and technical experts review identified needs and validate scope, urgency, and impact.
    3. Funding Alignment - Projects are evaluated against available state, campus, and other funding opportunities.
    4. Implementation Planning - Approved projects move into planning, design, scheduling, and construction coordination.
  • Types of Deferred Maintenance Projects
    • HVAC – Repairs and upgrades to heating, ventilation, and cooling systems
    • Electrical – Improvements to power systems and infrastructure
    • Plumbing – Replacement and repair of piping and fixtures
    • Building Exterior – Roofs, walls, windows, and waterproofing
    • Interiors – Floors, ceilings, and interior finishes
    • Infrastructure – Campus utilities and underground systems
    • Fire & Life Safety – Alarm and suppression systems
    • ±¬ÁÏÉçÇø – ADA-related improvements
    • Vertical Transportation – Elevators and lifts
  • Current Focus and Upcoming Work
    • HVAC system upgrades
    • Roof and exterior repairs
    • Fire and life safety improvements
    • Infrastructure renewal
  • Funding and Strategy
    Deferred maintenance funding is not always consistent and often depends on state allocations and available campus resources. ±¬ÁÏÉçÇø uses a strategic approach to prioritize investments and plan for long-term facility renewal. Deferred maintenance extends beyond addressing aging systems. It plays a critical role in preserving campus assets and ensuring safe, reliable, and sustainable environments over time.
  • How the Campus Community Can Engage
    • Report facility issues through the work request system
    • Partner early with FDM on space or project needs
    • Support responsible use of campus facilities
  • Past Projects
    Projects completed since 2023
    Project Name Building Project Scope
    Piping Reroute Arts Elevator ARTS Reroute piping in Arts
    Replace Sci2 server room HVAC with DX SCI2 Install emergency power air conditioning in the Science 2 server room
    UHall A/C Replacement UHALL Replace aging IDF A/Cs in U-Hall rooms 232, 332 and 432.
    Paint railings and building steel campus wide CW Sand blast, prime, and paint building metal and handrailing's campus wide.
    Install DSX card access on exterior classrooms at Cougar Central, ACD, & VEP ADMN, ACD, VEP DSX card access at Cougar Central, VEP, & ACD 1st floor
    BAS upgrade from Siemens to Tridium at SHCS & Sports Center SHCS, SC Start phase 1 of replacing the campus' Siemens Apogee Building Automation System (BAS) to Tridium
    Commons Elevator 4 Modernization COMM Modernization of the obsolete Commons Elevator #4 
    Tunnel pipe support and insulation repair CW Repair damaged pipe supports, improve piping insulation, replace worn landmark markers and building signage, and paint natural gas line.
    Roadway repair CW Campus View Drive roadway is in need of repair. Several areas has tree uprooting issues and cracks that needs repair.
    Move ACD FC-1 to ground ACD Move Fan Coil #1  behind the main lecture hall of ACD to the ground.
    ADMN Phase 2 window resealing ADMN   Re-seal the remainder of Administration Building window Phase 2
    Commons Elevator 3 Modernization COMM Modernization of the obsolete Commons Elevator #3
    Manual keypad lock replacement w/DSX CW Scope to upgrade to persona keypad with contractor assist; Run CAT5 from data room to door; Supply and install multi-credential keypad lock
    Markstein carpet replacement MARK Several classrooms in Markstein Hall has a carpet that are deteriorating and coming unglued from the floor base and causing trip hazard. The carpet needs to be replaced.
    Lighting from CFH to XYZ CW Install outdoor pathway lighting from CFH to XYZ
    ADM Roof Phase 1 ADMN Replace deteriorating and aging roofing at the administration building
    Mark EDG MARK Replace the leaking Markstein generator radiator
    Arts Chilled Water Piping ARTS Replace Arts CHWS and CHWR lines on the third floor up to the riser on the roof.
    Arts 101 Lighting ARTS This is to replace the aging light fixture system at Arts 101. The fixtures are failing and suseptible to fire due to high heat intensity and need to be replaced with a much cooler, safer LED lighting fixture.
    ARC Flash Study CW Campuswide electrical distribution arc flash engineering study
    Office Of the President Balcony ADMN President's balcony exterior stucco elastomeric paint, water issues
    ADMN Fire Upgrade ADMN building fire system upgrade
    SCI 1 Fire Upgrade SCI1 building fire system upgrade
    Commons Fire Upgrade COMM building fire system upgrade
    Sewer & Drain Inspections and Jetting CW Campuswide Sewer and storm drain video camera inspection
    MARK Window Resealing MARK Markstein Hall to re-seal windows at the East side of the building, phase 1.
    ACD AHU #4 Refurb ACD Overhaul the ACD Air Handling Unit #4
    UHALL Window Resealing UHALL University Hall window re-sealing phase-1. To remove and replace window sealant at the West side of University hall.
    ADMN Elevator Modernization ADMN Complete Modernization of ADMN Elevator 1
    ACD Ceiling Tiles ACD Replace ceiling tiles in ACD classrooms and offices
    UHALL Flooring UHALL UHall flooring replacement. Several areas of UHall has uplifting flooring and need to be replace.
    Campus View Drive / Slurry CW Repair and slurry the road at Campus View Drive.
    Commons MAUs COMM Replace the MAUs at Commons
    Expansion Tank Replacement Campuswide CW Replace expansion tanks campus wide
    Sci 2 Water Heater Replacement SCI2 Replace Water Heater in Sci 2
    ADM FLS PreAction ADMN Admin Building FLS Pre-Action system to be replaced
    Commons Repipe COMM Replace the chilled water piping in Commons.
    Campus Wide Roof Inspections & Maintenance CW Inspection, repair and maintenance 29 campus roofs
    ADM Roof Cap ADMN Install new parapit cap, existing is deteriorated. Epoxy roof area, existing has cracks and leaks during rain events.
    ViaSat AC VEP Replace A/C-5 on the ViaSat roof.
    Arts Piping Replacement Tunnel to 3rd ARTS Arts Piping Replacement Tunnel to 3rd
    ACD Elevator Modernization ACD ACD 1 Elevator Modernization
    Sci 1 AHU motor replacement SCI1 Sci 1 AHU motor replacement
    Sci 2 AHU Fanwall SCI2 Sci 2 AHU Fanwall
    Sci 1 Repipe SCI1 Sci 1 Repipe
    Sci 2 Fuel Tank SCI2 Sci 2 Fuel Tank
    ADMN 6th Floor Waterproofing ADMN ADMN 6th Floor Waterproofing
    Sci 2 Elevator #1 Motor Rebuild SCI2 Sci 2 Elevator #1 Motor Rebuild
    Kellogg Elev #1 Drive replacement KELL Replace Failed Obsolete Drive on Kellogg Elev #1
    UPS replacement (Mark stein) MARK Replace UPS (power supply backup)
    Replace Water Heater SBSB SBSB Replace waterheater, past life expectancy 
    Tunnel Support Repairs, Epoxy (one time) CW Epoxy pipe rack support pads, repair/replace rusted/deteriorated pipe rack support pads, and repair leaks.
    Replacement Tunnel Gas Sensors CW Replace the end of 5-year life Tunnel gas Sensors
    Reline Sewer Pipe Clark Field House CFH Relining the 6" sewer main the running adjacent to the Clark Field House. Pipe was damaged during the installation of the perimeter file between the softball field and the Clark Field House.
    Well Motor Replacement CW Replace failed motor at the Well
    Admn Rotunda Elevator ADMN Replace Rope Gripper Elev 5
    Chiller 3 Replacement CW Replace Chiller 3 at CP
    Campus Wide Fire System Upgrade CW Upgrade campus wide fire systems
    ACD Exterior Door Replacement ACD Install new exterior doors at ACD

 